Feel free to get in touch if you want to collaborate with us. Drop us a line via email or Instagram.

Roofing Drainage Mat

Eurovent® MATT, a single-layer braid from polypropylene fibres forming an 8 mm high layer. It is recommended for sloping roofs under metal coverings made for standing seam, and in facades as a drainage for metal cladding. It is suitable for use in frame houses.

Roofing Drainage Matcover
Premium Metal Roof Accessories

Roofing Drainage Mat

Eurovent® MATT, a single-layer braid from polypropylene fibres forming an 8 mm high layer. It is recommended for sloping roofs under metal coverings made for standing seam, and in facades as a drainage for metal cladding. It is suitable for use in frame houses.

Specifications

  • Weight

    300 g/m2

  • Reaction to fire

    Class F

  • UV resistance

    4 month

  • Roll Length

    25 m (82 ft)

  • Roll Width

    1.4 m (3.28 ft)

  • Roll coverage

    35 m2 (376 SF)

  • Thickness

    ≥ 7,5 (± 1) mm

  • Temperature resistant

    -40 to +100 [ºC]

features

Advantages of choosing Roofing membrane

Condensate drainage

Fast and easy installation

Provides drainage

Provides ventilation

Basic nuances and common details

  • Application

    Underlay is designed for use as separation mat for ventilated
    sloping roofs, insulated and non-insulated, as well
    as fully sarked. Strongly recommended for application with
    standing-seam metal roofing. Product is also suitable for use
    in ventilated and non-ventilated facades. Polypropylene multifilament acts as a separation layer and significantly
    improves durability of the roof by ensuring proper ventilation and condensate drainage.

  • Storage / transport

    The product should be stored in a dry place, under cover, free from moisture and UV radiation in original undamaged and closed package. Rolls should be transported in covered means of transport. They should be prepared for transport in a manner that protects them from damage and destruction. During transport safety regulations must be observed. The product should be protected from chemical agents, in particular solvent-based substances, as they can reduce technical parameters of foil or permanently damage it.

  • Installation

    Installation of the roof cover should be completed within 4 weeks after mounting the roofing membrane. With in 12 weeks of the installation, thermal insulation or attic blackout should be installed in the attic. The product is under warranty, providing that the guidelines contained in technical data sheet are being obeyed. We reserve
    the right to refuse a complaint recognition in case of not following these guidelines.

get in touch

Your satisfaction is our priority and we build lasting relationships

Get a quote

If you want to contact with us, place an order or have any questions, please fill out this form.

I agree to the processing of my personal data.